Finished the concrete.
The inside dimensions of the pit are 3x1m but to have enough space to put the concrete blocks in I made it 3.30x1.50 and 1.90 deep this gives almost 9 cubic meter of soil I think that’s approximately 8 to 9 ton I had to dig out no wonder my arms are feeling heavy.
Two days later starting to build the walls.
The first row.
I made almost 2 ton of concrete for the floor and the concrete bricks aren’t light either.
I don’t need much to fall asleep at nights.
Making progress