staircase preparations
I’m making a wooden frame for the staircase.
Putting some special oil on the wooden frame to make sure it comes out easy when the concrete has dried.
The wooden frame is fixed to the cellar wall.
29 mills of concrete to do the 4 hours job but everything went alright.
Geen opmerkingen:
Een reactie posten
Nieuwere post
Oudere post
Homepage
Abonneren op:
Reacties posten (Atom)
Volgers
Blogarchief
►
2013
(20)
►
december
(20)
►
2012
(22)
►
augustus
(2)
►
juli
(20)
►
2011
(51)
►
december
(8)
►
oktober
(5)
►
september
(11)
►
juli
(4)
►
mei
(12)
►
januari
(11)
▼
2010
(73)
►
december
(4)
►
augustus
(2)
►
juli
(10)
►
juni
(8)
►
mei
(11)
►
april
(5)
►
maart
(9)
►
februari
(1)
▼
januari
(23)
Messy interior
Front wings almost done
Little progress
Last row
Laying bricks
staircase preparations
Safety first
More materials
Inspection of the inspection pit
Side project
Front windscreen out
Two front wings ready
Right front wing
A good job
Frontwings sandblasted
Engine bay paint removal
More new parts
The day before Christmass
Small progress
Rusty front wings
Where will it end?
Rusty wheel arches
Finally at the workshop
►
2009
(36)
►
december
(36)
Over mij
Triumph TR7V8 coupé
Mijn volledige profiel tonen
Geen opmerkingen:
Een reactie posten